During the testing phase of a project, the team discovers problems in the deliverables that need to be documented and tracked for resolution. Which tool should the project manager use to record these problems to manage their correction?
The defect log is the appropriate tool for recording, tracking, and managing problems found in project deliverables during testing. It specifically focuses on defects or bugs that need to be fixed to meet quality standards. The change log records approved changes to the project scope, schedule, or cost, not issues with deliverables. The issue log is used to document and track general project issues that require attention but may not be related to product defects. The risk register is used to identify and manage potential risks that could impact the project, not actual defects found during testing.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
What is a defect log and how is it different from an issue log?
Open an interactive chat with Bash
Why is it important to have a defect log during the testing phase?
Open an interactive chat with Bash
What is the difference between a risk register and a defect log?